WFF I&T 2005 
Instrument at WFF - Young Soo
Instrument at WFF - Young Soo
Viewed: 842 times.

Hardworking Peter - Young Soo
Hardworking Peter - Young Soo
Viewed: 782 times.

CVD arrived on 7/19/05
CVD arrived on 7/19/05
Viewed: 745 times.

Chrenkov Vacuum test - Young Soo
Chrenkov Vacuum test - Young Soo
Viewed: 834 times.

Legs are on - Young Soo
Legs are on - Young Soo
Viewed: 671 times.

Unstacking the Instrument - SungO Chin
Unstacking the Instrument - SungO Chin
Viewed: 605 times.

Covering the Instrument - SungO Chin
Covering the Instrument - SungO Chin
Viewed: 608 times.

Cherenkov was installed - SungO Chin
Cherenkov was installed - SungO Chin
Viewed: 801 times.

Upper structure was ready for mounting CVD
Upper structure was ready for mounting CVD
Viewed: 750 times.


Photo acknowledgment should be given to NASA and University of Maryland Cosmic Ray Physics Laboratory.
Powered by Gallery v1 RSS