2005 Flight Preparation on the Ice 
11/18/05 The instrument is getting ready for lift
11/18/05 The instrument is getting ready for lift
Viewed: 1335 times.

11/18/05 The instrument is lifting for putting legs on
11/18/05 The instrument is lifting for putting legs on
Viewed: 1216 times.

11/18/05 Legs are on,
11/18/05 Legs are on,
Viewed: 1136 times.

11/18/05 Legs are on 2
11/18/05 Legs are on 2
Viewed: 1172 times.

11/19/05 Instrument and CDM are connected. (After that, LPT was performed..)
11/19/05 Instrument and CDM are connected. (After that, LPT was performed..)
Viewed: 1175 times.

11/20/05 Sunday Morning Check, Everything is fine
11/20/05 Sunday Morning Check, Everything is fine
Viewed: 1238 times.

11/20/2005 A bird on the road
11/20/2005 A bird on the road
Viewed: 1187 times.

11/21/05  Stage for external test was moved in front of the building
11/21/05 Stage for external test was moved in front of the building
Viewed: 1205 times.

11/21/05 CDM is moved under the instrument
11/21/05 CDM is moved under the instrument
Viewed: 1558 times.


Photo acknowledgment should be given to NASA and University of Maryland Cosmic Ray Physics Laboratory.
Powered by Gallery v1 RSS