S3 from CREAM I flight arrived on 4/5/05
Viewed: 794 times.
|
Functional check of S3 by Nick and Isaac on 4/5/05
Viewed: 702 times.
|
For Cabling, Larry put calorimeter a box on the pallet on 5/6/05
Viewed: 653 times.
|
Calorimeter Full Read-out Test started from 5/16/05
Viewed: 674 times.
|
SCD integration on 6/7/05
Viewed: 743 times.
|
SCD integration on 6/8/05
Viewed: 695 times.
|
SCD integration on 6/9/05
Viewed: 690 times.
|
SCD integration on 6/9/05
Viewed: 722 times.
|
ISS is on!
6/18/05
Viewed: 700 times.
|