CREAM Calorimeter Construction I ( ~ May 2006) 
2006/3  Fiber Spooling setup is ready
2006/3 Fiber Spooling setup is ready
Viewed: 1038 times.

2006/4/3 Students are working on making ribbon.
2006/4/3 Students are working on making ribbon.
Viewed: 934 times.

2006/3 Ling (who made CREAM 1 fiber) visited lab for advice
2006/3 Ling (who made CREAM 1 fiber) visited lab for advice
Viewed: 940 times.

2006/4 Students starts making ribbons.
2006/4 Students starts making ribbons.
Viewed: 916 times.

2006/3 First batch of fibers came back from Fermi Lab after ICE cutting.
2006/3 First batch of fibers came back from Fermi Lab after ICE cutting.
Viewed: 907 times.

2006/3 Fibers are checked and ready for striping.
2006/3 Fibers are checked and ready for striping.
Viewed: 907 times.

2006/4/13 Students are making ribbons.
2006/4/13 Students are making ribbons.
Viewed: 907 times.

2006/4/13 Students are making ribbons.
2006/4/13 Students are making ribbons.
Viewed: 921 times.

2006/4/13 Students are making ribbons.
2006/4/13 Students are making ribbons.
Viewed: 913 times.


Photo acknowledgment should be given to NASA and University of Maryland Cosmic Ray Physics Laboratory.
Powered by Gallery v1 RSS