CREAM Electronics Status 
2006/4/19 New Sparsification boards with USB connection!
2006/4/19 New Sparsification boards with USB connection!
Viewed: 1097 times.

2006/4/19 Peter is working on SFC(test) frame design.
2006/4/19 Peter is working on SFC(test) frame design.
Viewed: 1023 times.

2006/4/19 Peter and Peter are talking about frame design of SCF comparing with that of previous one.
2006/4/19 Peter and Peter are talking about frame design of SCF comparing with that of previous one.
Viewed: 1037 times.

2006/4/19 Sonny is working on SFC with USB system.
2006/4/19 Sonny is working on SFC with USB system.
Viewed: 1027 times.

2006/05/26 Peter is building a frame for Beam Test SFC
2006/05/26 Peter is building a frame for Beam Test SFC
Viewed: 957 times.

2006/05/26  Beam Test SFC is completed.
2006/05/26 Beam Test SFC is completed.
Viewed: 924 times.

2006/05/30 Beam tracker board
2006/05/30 Beam tracker board
Viewed: 922 times.

2006/06/19 USB Sparsification board.
2006/06/19 USB Sparsification board.
Viewed: 923 times.

2006/06/23 Larry made NIM to TTL board for muon test set-up.
2006/06/23 Larry made NIM to TTL board for muon test set-up.
Viewed: 886 times.


Photo acknowledgment should be given to NASA and University of Maryland Cosmic Ray Physics Laboratory.
Powered by Gallery v1 RSS