CREAM 3 Calorimeter Stacking up 
2006/08/23 Bottom plate on the palette
2006/08/23 Bottom plate on the palette
Viewed: 1085 times.

2006/9/1 All the quartets are arrived
2006/9/1 All the quartets are arrived
Viewed: 940 times.

2006/9/1 During the pre-stacking up, tungsten layer and new quartets
2006/9/1 During the pre-stacking up, tungsten layer and new quartets
Viewed: 952 times.

2006/9/1 Pre-stak up layers was performed
2006/9/1 Pre-stak up layers was performed
Viewed: 935 times.

2006/9/1 Pre-stak up layers was performed
2006/9/1 Pre-stak up layers was performed
Viewed: 905 times.

2006/9/3 Pre-stackup was done without fibers.
2006/9/3 Pre-stackup was done without fibers.
Viewed: 889 times.

2006/9/1 Pre-stak up layers was performed
2006/9/1 Pre-stak up layers was performed
Viewed: 931 times.

2006/9/1 Two Tedlars were set on the botton aluminum layer
2006/9/1 Two Tedlars were set on the botton aluminum layer
Viewed: 857 times.

2006/9/6 Two Tedlars  were cutting to the tungsten size.
2006/9/6 Two Tedlars were cutting to the tungsten size.
Viewed: 915 times.


Photo acknowledgment should be given to NASA and University of Maryland Cosmic Ray Physics Laboratory.
Powered by Gallery v1 RSS