Cosmic Ray Energetics And Mass (CREAM)

  • Increase font size
  • Default font size
  • Decrease font size
Home CREAM Flights CREAM IV
CREAM Flight 2008

2007 CERN Beam Test schedule announcement

Print PDF
Dear colleagues,

As Sasha explained below in his e-mail, we have successfully received a beam time (9/13 - 9/27) at the CERN H2 beam line for this year. Please find schedules in the following links.
http://spsschedule.web.cern.ch/SPSschedule/schedules/sps/all.pdf
http://spsschedule.web.cern.ch/SPSschedule/schedules/sps/p4.pdf

Many thanks to Michel and Sasha.
Cheers, MooHyun.

Alexandre MALININE wrote:
> According to the first version of the "CERN SPS Users
> Schedule for the 2007 running", just published, we got
> a time slot for 13-27 September 2007 at H2A (our usual
> place). Two weeks block (one week booked as CREAM and
> another as CHERCAM). This is what we asked for.
> Congratulations,
>
> Sasha
>

MooHyun, March 20, 2007
Last Updated on Friday, 21 November 2008 22:05
 


Page 12 of 12

Time Zones

Official CREAM Logo

CREAM Logo

CREAM IV Flight Trajectory

Click the map below to see the CREAM IV flight trajectory.

CREAM IV flight trajectory

2008 Major Milestones

Jan:  Delivery & mechanical fit-check of upper structure
Mar 12:  Delivery of recovered CREAM-III detector systems.
Mar-May:  Refurbishment of detector systems.
Apr 14-18:  Assembly of the upper structure.
May 5-9:  Integration of TCD.
May 12-16:  Integration of Chercam.
Jun. 3:  Integration of the SCD.
Jun. 3:  Mechanical integration of the CD.
May-Jun:  Integration and long term burn-in.
Jul 7:  Shipping instrument to CSBF.
Jul 9-31:  Integrate instrument with CDM & balloon-craft buildup at CSBF.
Aug. 1-5: Hang-test and long term burn-in at CSBF.
Aug. 20: Mission Readiness Review .
Aug. 18: GSE sea containers ship to the ICE from CSBF.
Aug. 28: Instrument sea container ship to the ICE from CSBF.
Sep. 8: Instrument sea container arrive at Christchurch, NZ.
Oct. 23: Mission Operations Review.
Nov. 7 (NZT) : First 5 launch crews arrive at McMurdo
Nov. 9-30 (NZT): Integrate instrument with CDM & balloon-craft building at Willie Field
Dec. 1 (NZT): Hang-test at Willie Field, CREAM-IV Flight ready
Dec. 3 (NZT): WFF Flight Readiness Review (FRR)