Building Layout
|
|
|
|
Building Internal View - Assembly Area
|
|
|
|
Upstairs Counting Room Area
|
|
|
|
Inside Counting Room
|
|
|
|
Set up the beam, trigger, tracker etc.
|
|
|
|
|
Crane Instrument from Assembly Area to Beam Area
|
|
|
|
Arriving at the H2 Beam Area
|
|
|
|
Landing on the H2 Lift Table
|
|
|
|
Fitting Rotation Fixture to the Table
|
|
|
|
Landing CREAM1 + rotation fixture on the table
|
|
|
|
|
Safety Inspection & Grounding
|
|
|
|
Repair as needed
|
|
|
|
Rotation Fixture Control
|
|
|
|
Rotate the instrument
|
|
|
|
Rotate the instrument
|
|
|
|
|
Beam On
|
|
|
|
Beam on
|
|
|
|
Taking Data
|
|
|
|
Beautiful data, e.g.,150 GeV electron shower
|
|
|
|
Instrument top exposure
|
|
|
|
|
Instrument top exposure
|
|
|
|
Lead Upstream
|
|
|
|
Instrument bottom exposure
|
|
|
|
Lead mounted under the pallet
|
|
|
|
Angle scan
|
|
|
|
|
Detaching CREAM1 from Rotation Fixture
|
|
|
|
Crane CREAM1 back to Assembly Area
|
|
|
|
CREAM1 back to Assembly Area
|
|
|
|
CREAM2 ready to be picked up
|
|
|
|
Putting on the trunnions & their holders
|
|
|
|
|
Crane up CREAM2
|
|
|
|
Crane CREAM2 to beam area
|
|
|
|
Landing CREAM2 on the rotation fixure
|
|
|
|
Attaching CREAM2 to the rotation fixture
|
|
|
|
Rotating CREAM2 forward
|
|
|
|
|
Rotating CREAM2 backward
|
|
|
|
Two spare tungsten layers
|
|
|
|
lead bricks and the lead holder
|
|
|
|
limit switches
|
|
|
|
CREAM2 top exposure
|
|
|
|
|
CREAM2 top exposure
|
|
|
|
CREAM2 top exposure
|
|
|
|
|
|
Calorimeter Module
|
|
|
|
Calorimeter Module - crane ride through a narrow asile
|
|
|
|
Calorimeter module landing at the beam line: David (CREAM) and Goliath
|
|
|
|
Balancing the weight at the landing
|
|
|
|
Attachment of the H4 lift table to the I-beam under the rotation fixture
|
|
|
|
|
TCD prototype in front of the calorimeter
|
|
|
|
CREAM2 calorimeter
|
|
|