Last Update: September 7, 2003   Author: Eun-Suk Seo

CREAM Calibration at CERN, H2 beam line, Sept 2003

Building Layout

Building Internal View - Assembly Area

Upstairs Counting Room Area

Inside Counting Room

Set up the beam, trigger, tracker etc.

Crane Instrument from Assembly Area to Beam Area

Arriving at the H2 Beam Area

Landing on the H2 Lift Table

Fitting Rotation Fixture to the Table

Landing CREAM1 + rotation fixture on the table

Safety Inspection & Grounding

Repair as needed

Rotation Fixture Control

Rotate the instrument

Rotate the instrument

Beam On

Beam on

Taking Data

Beautiful data, e.g.,150 GeV electron shower

Instrument top exposure

Instrument top exposure

Lead Upstream

Instrument bottom exposure

Lead mounted under the pallet

Angle scan

Detaching CREAM1 from Rotation Fixture

Crane CREAM1 back to Assembly Area

CREAM1 back to Assembly Area

CREAM2 ready to be picked up

Putting on the trunnions & their holders

Crane up CREAM2

Crane CREAM2 to beam area

Landing CREAM2 on the rotation fixure

Attaching CREAM2 to the rotation fixture

Rotating CREAM2 forward

Rotating CREAM2 backward

Two spare tungsten layers

lead bricks and the lead holder

limit switches

CREAM2 top exposure

CREAM2 top exposure

CREAM2 top exposure

 

CREAM Calibration at CERN, H4 beam line, July 2003

Calorimeter Module

Calorimeter Module - crane ride through a narrow asile

Calorimeter module landing at the beam line: David (CREAM) and Goliath

Balancing the weight at the landing

Attachment of the H4 lift table to the I-beam under the rotation fixture

TCD prototype in front of the calorimeter

CREAM2 calorimeter