12/17/2004 | ||||||||
0:21 | sent get_spi.stol | TG | ||||||
>> we received spi, spi2 and spi3. | ||||||||
0:48 | SCI_SW_OPMODE 0 | GR | ||||||
SCI_SNIO_CONTROL 21,0 | ||||||||
Execute script daq_restart.stol | ||||||||
1:30 | SCI_SW_OPMODE 0 | TG | ||||||
SCI_SNIO_CONTROL 21,0 | ||||||||
Execute script daq_restart.stol | ||||||||
1:49 | SCI_SW_OPMODE 0 | GR | ||||||
SCI_SNIO_CONTROL 21,0 | ||||||||
Execute script daq_restart.stol | ||||||||
2:00 | ESC send us play-back data (from 20041216-193036c.spi3 , GMT) | |||||||
2:08 | SCI_SW_OPMODE 0 | TG | ||||||
SCI_SNIO_CONTROL 21,0 | ||||||||
Execute script daq_restart.stol | ||||||||
2:35 | playback data receaving done, waiting for another playback data | |||||||
2:40 | Second play-back data does not come well | |||||||
>>WARNING: Ipacketlist : pl0 :discarded packet. | ||||||||
But, after 3mins, it looks ok | ||||||||
>> 200 events | ||||||||
4:04 | SCI_SW_OPMODE 0 | TG | ||||||
SCI_SNIO_CONTROL 21,0 | ||||||||
Execute script daq_restart.stol | ||||||||
Plak-back finished at some point. | ||||||||
4:50 | ESC start sending other play-back data(from 22:00 to 22:20 GMT) | |||||||
4:53 | It's done without any files. I guess, it has only displaying data and housekeeping. | |||||||
5:30 | SCI_SW_OPMODE 0 | TG | ||||||
SCI_SNIO_CONTROL 21,0 | ||||||||
Execute script daq_restart.stol | ||||||||
6:50 | SCI_SW_OPMODE 0 | GR | ||||||
SCI_SNIO_CONTROL 21,0 | ||||||||
Execute script daq_restart.stol | ||||||||
7:08 | Run New Sparcification for SCD throuth all chennels(YS/OP) | KC | ||||||
7:22 | Send "get_spi.stol" to get spi1,2, and 3 by YS/OP | KC | ||||||
7:27 | ESC told us that receiving and commanding are not available | KC | ||||||
until 8:15 due to switching TDRSS to IRIDIUM. | ||||||||
8:19 | resumed receiving data | KC | ||||||
8:20 | Standby mode | KC | ||||||
8:23 | receiving playback (data from12:22 to13:20 ) | KC | ||||||
8:37 | SCI_SW_OPMODE 0 | KC | ||||||
SCI_SNIO_CONTROL 21,0 | ||||||||
Execute script daq_restart.stol | ||||||||
9:00 | Sent all data and hsk files to Simon by scp | KC | ||||||
9:15 | data disconnected and connected right away | KC | ||||||
9:37 | SCI_SW_OPMODE 0 | GR | ||||||
SCI_SNIO_CONTROL 21,0 | ||||||||
Execute script daq_restart.stol | ||||||||
9:40 | Opher sent command 'get_spi.stol' | KC | ||||||
command sent for SCD - 26 chennels sparcification to be updated | ||||||||
because the 26 chennels running with low sparcification and the | ||||||||
data are too much noisy. | ||||||||
'scd_spars_update.stol' sent by OP | ||||||||
11:43 | SCI_SW_OPMODE 0 | GR | ||||||
SCI_SNIO_CONTROL 21,0 | ||||||||
Execute script daq_restart.stol | ||||||||
11:59 | SCI_SW_OPMODE 0 | GR | ||||||
SCI_SNIO_CONTROL 21,0 | ||||||||
Execute script daq_restart.stol | ||||||||
12:09 | Opher sent commands | JH | ||||||
SCI_ENABLE_AUSTV 2296, 2, 20 | ||||||||
SCI_ENABLE_AUSTV 2296, 0, 3 | ||||||||
SCI_ENABLE_AUSTV 2296, 1, 1 | ||||||||
and he changed scd_spars_update.stol | ||||||||
one channel number changed from 2298 to 2296 | ||||||||
13:43 | sent 3 commands, but failed sending script daq_restart.stol | JH | ||||||
SCI_SW_OPMODE 0 | ||||||||
SCI_SNIO_CONTROL 21,0 | ||||||||
Execute script daq_restart.stol | ||||||||
closed CDAQ_CREAM, killed cdaq_cli and restarted. It's okay^^ | ||||||||
miscommunicated with ESC, they disconnected data flow for a while | ||||||||
14:10 | Respond Sony's email to get the pmf000.tgz file, uncompress this file | HQ | ||||||
to get pmf000.000-pmf000.007 total 8 files, then ask ESC to copy and | ||||||||
uopload these 8 files | ||||||||
14:23 | Sonny sent email to YS for uploading pmf000.000-007 ugently | KC | ||||||
We(JH, HQ and KC) copied the files from email attached files. | ||||||||
We asked ESC to copy and upload the files, | ||||||||
However, commanding window is not enough to uploading. | ||||||||
ESC told us that they will upload at the next window time. | ||||||||
It will be from 3:45:30pm(EST) | ||||||||
15:59 | The window time is still not enouth to upload. | KC | ||||||
ESC finished only 2 files out of 8 | ||||||||
We, SOC, are just waiting ESC to finish uploading the files. | ||||||||
16:23 | SCI_SW_OPMODE 0 | KC | ||||||
SCI_SNIO_CONTROL 21,0 | ||||||||
Execute script daq_restart.stol | ||||||||
ESC finished 3 files out of 8 and keep doing upload …. | ||||||||
16:50 | ESC finished uploading | KC | ||||||
We sent the following commands to verify the results | ||||||||
SCI_SW_LOGFILE_SEND | ||||||||
We see a sys file and all frag from 0 to 7(20041217-214052.sys) | ||||||||
SCI_SW_NOOP | ||||||||
SCI_SW_CUSTOM | ||||||||
We got the 2nd sys file (20041217-214243.sys) | ||||||||
The file starts with | ||||||||
*** CUSTOM Fri Dec 17 21:42:43 GMT 2004 *** | ||||||||
However, there are no contents after that | ||||||||
In the Sonny's email we should see the 1,000 lines after the | ||||||||
above first line, but we don't. | ||||||||
We need to talk Sonny about that.(I sent an email to sonny with the result) | ||||||||
17:20 | Nahee and Pier Simone called Opher. | KC | ||||||
They requested the 'undo SCD sparcification' | ||||||||
and JH will send commands for that at the next window | ||||||||
18:14 | ESC said the satellites are being switched. | KC | <<< | Playback is done | ||||
The connection is closed and we are loosing data now. | <<< | at 19:50 | ||||||
ESC will let us know for the next available time. | <<< | |||||||
18:24 | Housekeeping start updating | YS | <<< | |||||
18:50 | Sent the script "scd_ch_coher.stol" by JH | KC | ||||||
18:52 | SCI_SW_OPMODE 0 | GR | ||||||
SCI_SNIO_CONTROL 21,0 | ||||||||
Execute script daq_restart.stol | ||||||||
19:00 | After automated Led-Run and Zcal-run, it became receiving pds files again... | YS | ||||||
SCI_SW_OPMODE 0 | ||||||||
SCI_SNIO_CONTROL 21,0 | ||||||||
Execute script daq_restart.stol | ||||||||
19:02 | Run New Sparcification for CAL and HDS throuth all channels | JH | ||||||
19;48 | SCI_SW_OPMODE 0 | GR | ||||||
SCI_SNIO_CONTROL 21,0 | ||||||||
Execute script daq_restart.stol | ||||||||
19:50 | ESC told that they are going to
send Play-back of disconnected time (18:14-18:25, today). However, it does not look coming.. |
YS | ||||||
I asked them to re-send them.. | ||||||||
20:07 | Pds files are coming again… PKT0 goes up to 5% | YS | ||||||
SCI_SW_OPMODE 0 | ||||||||
SCI_SNIO_CONTROL 21,0 | ||||||||
Execute script daq_restart.stol | ||||||||
20:13 | NET:19kbps, overall 21Hz, CAL: 0Hz | JH | ||||||
20:15 | sent cal_trig_threshold95.stol
to change cal trigger threshold from 100 to 95 |
|||||||
20:16 | SCI_SW_OPMODE 0 | JH | ||||||
SCI_SNIO_CONTROL 21,0 | ||||||||
Execute script daq_restart.stol | ||||||||
CAL trigger rate: 0.2Hz | ||||||||
20:20 | sent cal_trig_threshold90.stol | JH | ||||||
CAL trigger rate: 0.4Hz | ||||||||
from 20041218-011759.dat file cal_trig_threshold is changed | ||||||||
CAL trigger rate: 0.2Hz, NETwork rate: 20kbps | ||||||||
20:24 | sent cal_trig_threshold80.stol | JH | ||||||
20:36 | sent cal_trig_threshold.stol | JH | ||||||
CAL trigger rate:0.2Hz, NETwork rate:18kbps | ||||||||
20:38 | sent cal_trig_threshold50.stol | JH | ||||||
PKT0 goes up over 50%, finally 100% | ||||||||
20:41 | sent cal_trig_threshold80.stol | JH | ||||||
20:43 | SCI_SW_OPMODE 0 | JH | ||||||
SCI_SNIO_CONTROL 21,0 | ||||||||
Execute script daq_restart.stol | ||||||||
sent cal_trig_threshold95.stol | ||||||||
21:17 | SCI_SW_NOOP | YS | ||||||
SCI_SNIO_CONTROL 21,0 | ||||||||
After these commands, all the Warning message in GUI log are stopped | ||||||||
And, then, it started processing commands we sent 20 minutes ago. | ||||||||
Finally, it came back to original status. | ||||||||
Overall trigger rate:21hz (ZHI:21Hz and CAL 0Hz) | ||||||||
And, spi3 and dat files are coming.. | ||||||||
21:28 | sent cal_trig_threshold95.stol | YS | ||||||
>>check log file all commands gone through. | ||||||||
21:33 | 20041218-023133.dat | YS | ||||||
This data file will be trigger threshold with 95. | ||||||||
21:37 | sent cal_trig_threshold85.stol | YS | ||||||
20041218-023638.dat taken while thresholds switching to 85 | OG | |||||||
20041218-024140.dat being taken with thresthold 85. | ||||||||
sent cal_trig_threshold75.stol | ||||||||
21:49 | 20041218-024643.dat are in the transition to threshold with 75 | YS | ||||||
CAL trigger rate is between 3-12. ave(8-9) | ||||||||
20041218-025143.dat is taken with threshold 75 | ||||||||
PKT0 goes up slowly. | ||||||||
PKT0 is abot 1% | ||||||||
21:59 | sent cal_trig_threshold80.stol | YS | ||||||
22:04 | Pds files are coming again… | YS | ||||||
SCI_SW_OPMODE 0 | ||||||||
SCI_SNIO_CONTROL 21,0 | ||||||||
Execute script daq_restart.stol | ||||||||
20041218-030411.dat is taken with threshold of 80 | ||||||||
CAL trigger rate is now 0.2-0.4 Hz. | ||||||||
Opher sent CAL trigger rate threshold of 77. | ||||||||
20041218-030714.dat is in the transition of threshold 77. | ||||||||
CAL trigger rate is between 0.3- 2Hz | ||||||||
20041218-031217.dat is taken with threshold of 77. |