12/20/2004
0:34 ESC turned off the flight computer JH
0:36 ESC turned on the flight computer JH
They said that they are getting something.
ESC tried to reconnect with cdps2
0:48 restarted the cdaq-cream program for data flow JH
0:51 The connection was restored SO
1:00 We started the processing that parameters were turned on. SO
but SCD looks like power off
1:03 sent command : SCI_CAL_HV_LEVEL 0x05,0 ==>CAL MB5 turned off YS
Af first, I send "hv_on_hds_1220.stol", then bias went up but HV doesn’t goes up. Calorimeter's HV still goes up.
1:20 When we have commanding window again, we sent HV on commands for hds. YS
Set HV for cal to 6KV (2000)
1:28 power on SCD JH
ESC said they need to switch CDM flight computer. They said it will take 10 minues
1:37 While ramping up for HDS, HV of HDS for H11 and H12 fall down to zero. It looked like tripped. 
1:51 HV on SCD JH
1:59 For tripped H11 AND h12 YS
Send "SCI_HV_LEVEL 0x17, 0" // set HV  0 for H11
Send "SCI_HV_LEVEL 0x18, 0"   //set HV 0 for H12
send bias off "SCI_HDS_BIAS 0x17, OFF"
send bias off "SCI_HDS_BIAS 0x18, OFF"
Send Power off "SCI_HDS_DC_POWER 0x0D, OFF"
Send Power off "SCI_HDS_DC_POWER 0x0E, OFF"
Click "SYNC HV LEVEL"
POWER ON H11 and H12
BIAS on H11 and H12
Started ramping up HV to 6kV level (2000).
But, it tripped again around 3kV.
I'm going to leave them at 0 HV
Send "SCI_HV_LEVEL 0x17, 0" // set HV  0 for H11
Send "SCI_HV_LEVEL 0x18, 0"   //set HV 0 for H12
2:05 execute "SCD_CH_MASK_HOT3.STOL" YS
2:08 execute "arc_start.STOL" YS
2:10 execute "daq_start.stol" YS
2:12 GUI display started JH
1st data file received
2:33 send command "SCI_SW_CALIB_INTV 300"  YS
to receive spi files every 5 minutes
send "cal_trig_threshold90.stol" YS
to change CAL trigger threshold from 100 to 90
3:03 SCI_SW_OPMODE 0 YS
SCI_SNIO_CONTROL 21,0
Execute script daq_restart.stol
3:27 SCI_SW_OPMODE 0 YS
SCI_SNIO_CONTROL 21,0
Execute script daq_restart.stol
3:51 SCI_SW_OPMODE 0 YS
SCI_SNIO_CONTROL 21,0
Execute script daq_restart.stol
4:20 data windows was closed YS
4:47 SCI_SW_OPMODE 0 YS
SCI_SNIO_CONTROL 21,0
Execute script daq_restart.stol
6:06 SCI_SW_OPMODE 0 YS
SCI_SNIO_CONTROL 21,0
Execute script daq_restart.stol
6:58 ESC said they are going to send playback data YS
8:58 connection lost (this happened several times this morning)
9:56 SCI_SW_OPMODE 0 HP
SCI_SNIO_CONTROL 21,0
Execute script daq_restart.stol
10:25 SCI_SW_OPMODE 0 TG
SCI_SNIO_CONTROL 21,0
Execute script daq_restart.stol
10:30 SCI_SW_OPMODE 0 HP
SCI_SNIO_CONTROL 21,0
Execute script daq_restart.stol
10:35 Start ramping hodo MB12 first to 3 kV then 3.8 kV OG
10:40 Reducing trigger threshold from 90 to 77 (through 85 & 80) OG
20041220-154807.dat first one with 77 DAC threshold
10:57 Trigger threshold to 75 (cal trig rate ~1 Hz, data rate 25 kbps) OG
New file starts 20041220-155815.dat with 75 threshold
16:42 SCI_SW_FILE_LIST
16:43 SCI_SW_CUSTOM
Verified uploaded files were not corrupted.
16:49 SCI_SPARE0 0 SYZ
Updated flight sw to get cross-calibration events.
SCI_SW_OPMODE 0
Reset DAQ to start the updated flight sw.
Synchronized CAL hv settings.
SCI_SPARE1 0
which executed SFC scripts for channel masking and setting CAL trigger threshold to 100.
Executed script scd_ch_mask_hot3.stol.
Executed script cal_trig_threshold77.stol
Executed script daq_start.stol
SCI_SW_HDS_ENABLE_AUSTV 0xFFF, 2, 12 to set delta values
SCI_SW_HDS_PED_UPDATE_RUN 100 to reset STV with new delta values.
16:49 HV ramp up gradually on Hodo MB12 and MB03 trying for 9 kV OG
MB11 will be next (forward windows causing delays)
16:49 Cal trigger thresholds to 80 DAC OG
19:05 CAL trigger looks high (10-16Hz). KC
Buffer (PKT0) goes up to 4%
Cal trigger thresholds to 85 DAC  KC
SEND command to make H3 ramping up tp 9kV YS
19:32 SCI_SW_OPMODE 0 HP
SCI_SNIO_CONTROL 21,0
Execute script daq_restart.stol
19:33 SCI_SW_HV_LEVEL 0x0A,3500 YS
Check the status of HV
It says H3 area already in 3500 (hkview shows 8.0kV) and H11 are already in 1500 (4.0kV)
19:39 SCI_SW_HV_LEVEL 0x0A,3750
SCI_SW_HV_LEVEL 0x12,1750
H3 became 8.6kV and H11 became 4.5 KV
19:44 SCI_SW_HV_LEVEL 0x12,2000 (2250)
19:57 Data connection closed because TDRSS is below the horizon KC
8:08 Data resumed KC
8:13 SCI_SW_HV_0x12, 2500 (2750) KC
Playback started
8:32 SCI_SW_OPMODE 0 KC
SCI_SNIO_CONTROL 21,0
Execute script daq_restart.stol
8:33 SCI_SW_HV_0x12, 3000
8:34 SCI_SW_HV_0x04, 750 (MB5, Cal ramping)
8:36 MB11 of HDS is now 9.24kv 
11:41 Data and command window open KC
SCI_SW_HV_0x04, 1000 KC
 11:50 Data disconnected KC
12:22 Data connected  KC
12:32 SCI_SW_HV 0x04, 1250  KC
12:56 SCI_SW_HV 0x04, 1500 HP
1:14 SCI_SW_HV 0x04, 1750 KC
1:22 SCI_SW_HV 0x04, 2000 KC
1:25 We reached 6.09kv for MB5 of Cal. Successfully and no trip at all so far!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!! KC
3:15 Data stopped for 10 minutes due to window time KC
4:30 Data will be stopped for 30 minutes due to window time KC
6:40 Cal trigger thresholds to 82 DAC  KC
6:46 Playback started KC
7:47 ESC said will not get data in 30 min HQ
8:16 Start getting data HQ