12/24/2004
0:02 We changed the thresold to 70. The trigger rate kept its value around 2.
But the rate distribution was not steady. The range of distribution is from 1  to 8, sometimes over 10.
SO
0:39 We transmitted some files to ESC to update SFC. SO
1:06 TRD didn`t send any data for 20 minutes SO
2:20 ESC was sending the files, and the remaining ones were just 3. SO
3:00 We set thresold to 72 again because the rate is to high and the buffer reached at 15%.
After that, we could see the rate was positioned nearby 2~4.
SO
3:32 We just comfirmed all up-loading files. TG
4:02 sent command " SCI_SW_CUSTOM" and checked new sys file JH
6:05 cal trigger threshold 75 TG
6:27 sent command "get_spi.stol" JH
8:33 playback started -> failed and stopped KC
9:07 Send cal threshold of 72 (Cal) KC
10:06 ESC tried to send playback and network rate decreased so the pkt0 is
increased about from 
10:47 playback started  (datra from 2004/12/22:15:05 )
11:04 Cal trigger threshold 70 KC
11:33 Cal trigger threshold 72 KC
11:44 Playback started
13:30 TRD latch-up   (cal trigger is less than 1 hz, cal threshold 72) KC
13:39 TRD data flowing KC
13:45 TRD latch-up (cal trigger is less than 1 hz) KC
13:50 TRD data flowing KC
13:55 TRD latch-up (cal trigger is less than 1 hz) KC
13:59 TRD data flowing KC
14:02  TRD latch-up (cal trigger is less than 1 hz) KC
14:09 TRD data flowing KC
14:10 TRD latch-up (cal trigger is less than 1 hz) HQ
14:20 TRD data flowing HQ
14:42 TRD data flowing OK for 22 minutes with cal trigger rate less than 1 hz HQ
14:43 TRD latch-up (cal trigger is less than 1 hz) HQ
14:50 TRD data flowing HQ
15:03 TRD latch-up (cal trigger is less than 1 hz) HQ
15:10 TRD data flowing HQ
15:11 TRD latch-up (cal trigger is less than 1 hz) HQ
15:14 ESC disable the command and data window for primary Iridium test HQ
15:26 recover the data flow, no TRD latch-up yet in 6 min HQ
15:30 TRD latch-up (cal trigger is less than 1 hz) HQ
15:40 TRD data flowing HQ
15:45 TRD latch-up (cal trigger is less than 1 hz) HQ
15:51 TRD data flowing HQ
16:49 TRD latch-up KC
16:51 TRD data flowing HQ
17:50 data flow stop due to ESC satellite switch HQ
18:08 TRD latch-up (cal trigger is less than 1Hz) GR
18:14 TRD data flowing GR
19:35 TRD latch-up (cal trigger is less than 1Hz) GR
19:43 TRD data flowing GR
20:26 ESC said Data flow will be stopped  (1:16GMT) YS
21:10 Data flow continued.. YS
23:06 CAL trigger rate was too low (0-0.2 )
send a stol to change the CAL threshold to 70 from 72 YS
23:09 all 40 commands are confirmed from log file. YS
23:14 CAL trigger rate became about 02-1.0.. Still it looks small…
23:18 TRD latch-up (cal trigger is 0.6 - 1Hz)
23:35 TRD started working after second pedestal run. YS
23:42 Simon request HV change. YS
Address =9, Value =1225, "Ramp Down"
23:44 Address =9, Value = 1200, "Ramp Up" YS
TRD HV3  became 1.15kV