We checked muon runs with XeCo2 this morning.
Then, we disconnected all test cables to prepare for rotating the payload.
In the afternoon, BACCUS was rotated until the-X direction was on the bottom.
It was done very smoothly.
The input gas valve was kept closed while the output one was
kept half opened to avoid any pressure inside during moving.
Some photos are below.
We will move the payload to the beam stage tomorrow morning.
However, we are told that the beam will not be available until Friday.
Ki Chun
 