Dear,
Here is a summary of the hang test.
Based on the good weather forecast, the hang test was prepared right after we arrived at the Willie Field at around 8:30 AM. After the CREAM instrument was hung under the BOSS launch vehicle with crush pads and ballasts, the instrument LPT was started at around 11:50 AM (NZT) / 10:50 PM (GMT). The test was finished at around 3 PM (NZT) / 2 AM (GMT). Then the instrument was turned off and the payload was dismounted from the vehicle. By the time when the instrument was moved back to the inside of the payload building, it was at around 4:10 PM (NZT) / 3:10 PM.
During the hang test, the commanding and data flow from/to the SOC were tested successfully in Iridium and TDRSS modes also.
During the tests, all instruments show normal results.
Again, we like to thank those who have supported this hang test from SOC/WFF/CSBF/ICE very much.
Cheers, MooHyun.