Dear,

Finally, 5 of CREAM-IV launch crews have arrived at the McMurdo station at around 3 PM (NZ) after about 6 hours of comfortable flight from Christchurch via C-17. We met Jim Beatty's student and post-doc for the ANITA at the airport and heard that 5 ANITA members are already at the McMurdo and 5 more are going there with us.


After a briefing at the cafeteria, we had checked in dorm. rooms but found that there are no network connections at the assigned rooms. Dave Sullivan, who is the CSBF camp manager, is going to help us to move to other buildings with networks (208/209 with wireless, 203 with wired LAN) tomorrow.
After the dinner, Dave took me to the Willie field to show the CREAM instrument at the integration building. The CREAM instrument was already unpacked and sit on the top of the jig for leg mounting done by Fritz and Chris with CSBF riggers, I heard. And all the GSE crates are already in the building also.

Tomorrow, there will be another briefing by NSF in the morning. After the briefing, we will go to the Willie Field for the setting up of the GSE and possibly a LPT.

Before the briefing, we will ask for the scanning of notebook computers at the IT coordinator in the Craray Lab.

Cheers, MooHyun.