- Opened the wooden crate for the first priority flight back to UMD after recovery. Two PSU gray crates, calorimeter recovery trays, recovery tool box, cable protectors and CD crate were un-packed. The wooden crate was put together and moved back to the sea container "C".
- All GSE crates were moved up to the 2nd floor (mezzanine) for a storage.
- Power and Ethernet cables were secured with cable protectors taken from the wooden crate.
- TCD debugging started with Tyler's advice to check with voltages from power connectors to each concentrators. All of them were measured and +3.3 V were looked rather low according to Tyler.
- Ping to all concentrators were tried but only some of them were connected.
- From the tests results requested by Tyler as in the above, in a phone call, he suggested to push all female power connectors' pins together suspecting the same problem with a loose connection as we had in CSBF this summer. So after tightening all pins in 12 connectors, we turned on the power and the TCD came back to work. Tyler is going to think about how to improve those connectors in the future.
- Took 50 k muon events as a part of LPT. Now the LPT is complete and everything is in the same condition as we had tested at CSBF before the shipment.
- The back up PC was scanned for possible internet connection to outside. It seems quiet fast and simple. We can use DHCP for network connection unless we are going to use a static IP address. Even for the static IP address, we can apply like we did in last season for two notebook PCs.
- Chris has been preparing the SIP module. And the batteries were checked. Expect to have the SIP power tested and used tomorrow afternoon for the instrument.
- Fritz has been working on solar panels and the mezzanine organization for a storage space after the unpacking works.
- Moved to new rooms in the dorm 203C after returning to the town.
- CD HV conversion factor calibration. (Thu. AM 2 hours)
- Replace CAL spar boards and debug the noise issue. (Thu.)
- CAL trigger test. (Replace one ASIC chip which showed as dead trigger channels at CSBF before the shipping) (Thu.)
- Safe-to-mate with SIP power. (Thu.)
- TCD/CD housekeeping data long-term stability check. (Thu. - Sat.)
- CPT (Fri.-Sat.)
- Connection test with SOC. (Sat.)
- Takes photos for the recovery plan manual update. (Wed. - Sat.)
MooHyun