We finished the basic test and closed the payload cover in the afternoon.
CSBF will move the ULDB balloon into the PLB 1 on Monday or the next day
if weather is good.

An inspection of the PLB 1 facility, which was done yesterday by fire officers,
revealed no violations to the Fire Code of McMurdo Station.

There was strong winds with flurries in Willy Field.
It was close to "Condition 2".

The Polar vortex will not be quite set up on 12/13 yet
according to the 10 day forecast.

KC

UMD