and the weather condition was changed to "Condition 3" in the afternoon.
According to the 10 days weather forcast, anti-clock-wise cyclone will
not be quite ready on 12/11.
In the morning some more people (including David P. & Dwayne Orr) arrived
at LDB and started to share Mezzanine on the upstairs.
David Pierce & Dwayne Orr visited us during the telecon at 9 am NZT.
In the afternoon Dwayne Orr visted us again and suggested a meeting
for the Payload 1 floor plan at 10 am NZT in the tomorrow morning.
David Sullivan and Erich Klein will join the meeting also.
Even though our CREAM is ready to launch, we have to wait until
the Polar vortex is set up, which will probably take more than 10 days.
And we will keep checking the basic health of the each detector with minor testing.
KC




