It showed unstable status with changing its HV values. It seemed that HSK was OK.
However, after replacing its MB, the HV showed stable status with 3 KV for 2 hours.
We will check it for longer time tomorrow.
CSBF installed the protection cage on the launch vehicle.
and the launch vehicle was ready finally.
In the afternoon, there was a storm in the Willy Field.
The weather was "Condition 2" today.
The anti-clock-cyclone is getting developing.
(The possible launch day could be 12/12~12/18.)
KC