CSBF folks have to prepare not only ground safety documents but also hardware protection:
the protection cage for the launch vehicle gondola operator.
Because of the materials delivery time from US or out of Mcmurdo,
they may not complete the job until this Friday.
They expect the launch ready date as Dec. 1st.
Today, it is cold/cloudy/no wind.
The SFC1 flight mode running OK.
Anti-clock-wise cyclon is developing and the strength looks
almost the same as the clock-wise one.
KC