We had a discussion of the LDB1 floor plan w/ MooHyun.
We tested "USB List(20)" to check the USB status on SFC,
and all USB connection status was OK.
We will be off tomorrow, Sunday.
On Monday, CSBF will measure the weight of CREAM.
Today, it is a bit cold/a bit windy.
The Polar cyclron direction is still clock wise.
KC




