JH checked SCD spar. cables. After she hooked them off and up,
some of bad channel signals were gone
(It might be connection problems).
Bad channel signal of CAL was also disappeared by itself.
We finished CPT in the afternoon successfully.
We connected SIP through the local SEI computer and checked commands/data flow.
Both SFC1 & SFC2 showed good connectons and commands/data flow.
LPT with SFC1/SIP were done partly (Combined CPT).
Currently SFC2 in flight mode is running until tomorrow morning for a long term test.
Now we are ready to do an End-to-End test with SOC.
A connection test with SOC is scheduled on Nov 11, 12 pm (NZT) (Nov 10, 6 pm EST),
due to TDRSS time (1pm~).
SOC, please be prepared!
Here is an updated schedule (NZT)
11/10(Wed) - Combined CPT with SFC2 / Install HGA
11/11(Thur) - Connection Test with SOC from 12 pm (IRID/TDRSS/PCM)
11/12(Fri) - Install solar array
11/13(Sat) - Install solar array
11/14(Sun)
11/15(Mon) - Wire solar array/Route rotator
11/16(Tue) - Shielding
11/17(Wed) - Hang Test
David told me the ULDB gondolla will be moved to upstairs for the integration.
Today, it was pretty good in weather - clear/warm/no wind (became windy in the evening).
KC