The briefing lady introduced each room's function and how to utilize the lab.
We got the 112 rm (Crary Lab) keys from Scott.
We all moved to Willy Field with a Van after that.
David told us there would be instrument computer scan by a IT person in the afternoon.
We prepared cable connections, checking CDAQ on each computer and Power GSE software.
IT computer scanning guy came to the payload 1 building and checked the main computers.
Robin installed CREAM legs in the afternoon.
(Attached please find the CREAM-VI with having installed legs)
We connected to our Power GSE and ethernet to the client computer (direct connection).
We did a simple LPT with CAL, SCD (Ji Hye will report the results).
According to a test run, one channel in CAL, and several channels in SCD looked having bad connections.
We turned off all powers around 5:20pm to return to the base.
We will continue LPT tomorrow.
Today it was windy/cold/cloudy in the morning but became warm/carlm in the late afternoon.
KC