We (CREAM folks including CSBF people) got a briefing at Crary Lab in the morning.
The briefing lady introduced each room's function and how to utilize the lab.
We got the 112 rm (Crary Lab) keys from Scott.
We all moved to Willy Field with a Van after that.
David told us there would be instrument computer scan by a IT person in the afternoon.
We prepared cable connections, checking CDAQ on each computer and Power GSE software.
IT computer scanning guy came to the payload 1 building and checked the main computers.
Robin installed CREAM legs in the afternoon.
(Attached please find the CREAM-VI with having installed legs)
We connected to our Power GSE and ethernet to the client computer (direct connection).
We did a simple LPT with CAL, SCD (Ji Hye will report the results).
According to a test run, one channel in CAL, and several channels in SCD looked having bad connections.
We turned off all powers around 5:20pm to return to the base.
We will continue LPT tomorrow.

Today it was windy/cold/cloudy in the morning but became warm/carlm in the late afternoon.

KC

UMD