CREAM Flight 2005

Print PDF

Return of GSE Items from Cream 2

Hi,

Monday Young Soo and I went to WFF and brought back the Cream 2 "GSE" which was shipped back from McMurdo by ship and delivered by truck to WFF last Friday.
All the items were in one sea container, which appeared to be intact. Everything seemed to be physically ok when we opened the container - restraining straps were in place and nothing had shifted.
All the items have been unloaded and are being stored in our lab or in other borrowed space on the third floor. Recovered items were:

4 gray plastic containers labelled UMd
2 gray plastic containers labelled PSU
2 red boxes from UMn
2 empty gray wooden boxes from UMd, stored at WFF
1 wooden instrument crate, disassembled (demolished), stored at WFF
lots of cardboard honeycomb

Last Updated on Wednesday, 26 November 2008 02:40 Read more...
 

CREAM Flight 2005 Archive

Print PDF

ATIC launch

The balloon is being laid out for the ATIC launch. The expected launch time is 5 pm NZT.

ES | Dec 18, 2005 9:36 PM EST


CREAM launch

CREAM was launched about 5:13 AM in the morning of Dec 16 local time, NZT. The fog got cleared up magically, and it was a beautiful launch. Thank you, Ice crew & SOC. Have a couple of hrs of rest while the balloon goes up and gear up for the LOS data.

ES | Dec 15, 2005 11:39 AM EST

SOC, confirm if the "launch site streaming video"on http://www.nsbf.nasa.gov/antarctica/ice0506.htm is working.

ES | Dec 15, 2005 8:58 AM EST
Last Updated on Wednesday, 26 November 2008 02:41 Read more...
 


CREAM II Investigators and Collaborators

Principal Investigator

Collaborators

Official CREAM Logo

CREAM Logo

CREAM II Flight Trajectory

Click the map below to see the CREAM II flight trajectory.

CREAM II flight trajectory

2005 Major Milestones

09/08 - 09/11 Final assembly of Calorimeter
09/12 - 09/15 Cookie alignment
09/15 - 09/18 SCD in stallation, system troubleshoot, test
09/19 Pack and ship to CERN
09/20 - 09/26 Prepare BT (beam tracker)
09/26 Ship BT and supplemental supplies to CERN
09/27 UMD crew arrive at CERN
10/02 - 10/11 Beam Test at CERN
October - November Final instrument structural analysis and thermal design
10/01 - 12/31 Fabricate, new ISS Components, certify old ISS components